Reconstruction, repair and modernization of traction sub-stations Burgas, Karnobat and Yambol

Rehabilitation of Railway Infrastructure along Sections of the Plovdiv - Burgas Railway Line - reconstruction, repair and modernization of traction sub-stations Burgas, Karnobat and Yambol

Full name of the project

Rehabilitation of Railway Infrastructure along Sections of the Plovdiv - Burgas Railway Line - reconstruction, repair and modernization of traction sub-stations Burgas, Karnobat and Yambol

BG16M1OP001-1.001-0001-C02

Fund

ERDF/Cohesion Fund

 

Operational programme

OPTTI 2014-2020

Country

Bulgaria

Region

South Eastern Area

 

Short description of the project

The project will help Bulgaria to meet its commitments to the development of railway infrastructure, reaching European standards and contributing to the steady development of the Transport, the European Transport Network.

Description of the project and objectives

The Plovdiv — Burgas railway line is part of the TINA-network and the pan European transport corridor VIII. The existing railway line “Plovdiv — Burgas” is electrified with a total length of 292 km, of which 139 km — one and 153 km double line. The design speed of the railway is between 100-160 km/h. Supply with a nominal rated voltage of 25 kV of the overhead contact line on the railway section Mihaylovo to Burgas shall be provided from five traction substations, namely: HGV Stara Zagora, Nova Zagora, Yambol, Karnobat and Burgas.

The project will contribute to the implementation of commitments undertaken by the Republic of Bulgaria for the development of railway infrastructure, the achievement of European standards, in line with EU policy and the steady development of the Trans-European Transport Networks. Its implementation will provide a link to the project “Modernisation of the railway line Plovdiv — Svilengrad — Turkish, Greek borders”, which are in the process of the following international agreements and initiatives:

Trans-European network (TEN);

European Agreement on International Railway Lines (AGC);

European Agreement on International Rail Combined Transport Lines (AGTC);

The main purpose of the project is to restore, repair and upgrade three out of five traction substations that replenish the site. For all HDVs, Stara Zagora, Nova Zagora, Yambol, Karnobat and Burgas will also be built up a system for the remote control of HDVs, the JV and the SAO from the Plovdiv Central Dispatch Centre.The performance of the site shall aim to ensure a reliability of at least 30 years of life cycle, meeting existing European and national standards.

Results, achievements, impact

Three traction substations on the Plovdiv-Burgas stretch are modernised. Increased company energy efficiency. Telecontrol and video surveillance systems are installed.

 

Project Budget

in BGN

 

21 339 147.60

%

 

EU Contribution

 

 

85 %

 

European

co-financing

in BGN

17 782 623.00

 

National

co-financing

in BGN

2 667 393.45

 

Own funds

 

3 556 524.60

 

Start Date

 

18.07.2016

 

End Date

 

17.05.2019

 

Beneficiary

 

National Railway Infrastructure Company

 

Contacts 

of the beneficiary

Regional Central Office, Sofia 1320, Maria Louisa Boulevard No 110, Tel.: 02/932

Project website 

https://www.rail-infra.bg/bg/1

http://2020.eufunds.bg/bg/2/0/Project/Details?contractId=7u2gQeSQid0%3D&isHistoric=False